Electrical calculation tools | Schneider Electric Global

Looking for:

Looking for:

Feeder calculation 3 phase free download

Click here to Download

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Start by looking in the left column of Table The maximum demand for 10 Because of the system supplying power to this single-phase panelboard, it is not permissible to apply the additional demand of 70 percent to the neutral. The neutral load for 10 When more than three current-carrying conductors are in a raceway or cable, the allowable ampacity of each conductor must be reduced by the adjustment factors in Table The neutral may or may not be a current-carrying conductor.

In accordance with But, if the neutral is part of a three-wire circuit consisting of two phase conductors and the neutral conductor and it is supplied from a four-wire, three-phase, wye-connected system, the neutral must be counted as a current-carrying conductor. For example, a raceway containing eight conductors will supply power to four electric heaters. Two heaters are rated volt, single-phase. Each of these heaters will be on a separate circuit.

The other two of the heaters are rated volts and will be on separate circuits. A multiwire branch circuit will supply power to the two volt heaters. There also is an equipment-grounding conductor in the raceway. A three-phase, four-wire, wye-connected panelboard is supplying power to the heaters. What is the Table Because of Because of the system supplying power to these two volt heaters, the neutral must be counted as a current-carrying conductor.

The Table A lug is only one point. VA cannot exist at one point. Additionally, each lug realizes the full current of the load, not half. Assigning half the VA to each connected line is not a physical reality. It is only a means of shortcutting calculation.

If you had only one or two two-pole loads on a three phase system. Assigning half the load to each connected line would yield an inaccurate current value. For example, two 2. As you can see, the ratio of kVA results to I results are not the same. As I stated previously, assigning half the load to each connected leg is only accurate when the loads are balanced.

Take the above example and connect a third load CA, each leg would then be 2. One approach to reconcile this anomaly is to use the largest VA leg value as the value for all three. Last edited: Apr 3, Are you sure you have the decimal in the right place for phase B in your example?

Shouldn’t you have I have answered the best I can for the OP to calc his main breaker and feeder load, and the method I use is what I see on construction drawings regularly for calcs. GoldDigger Moderator Staff member. Greg said:. Location Ohio. Assuming a non-dwelling location, 5? GoldDigger said:. I realize I used V for the dryers even though they will be supplied with V.

Code requires specific appliances to be calculated using nameplate ratings. Unless it specifically has V ratings, have to use what’s there Last edited: Dec 10, I assume all the appliances may be in use at the same time. It covers communications systems and is not subject to the requirements of Chapters 1 through 7 except where the requirements are specifically referenced in Chapter 8. Chapter 9 consists of tables and is followed by annexes. Annexes are not part of the requirements of the NEC, but are included for informational purposes.

Annex C and D can be especially helpful. Annex C contains conduit and tubing fill tables for conductors and fixture wires of the same size. Tables 4 and 5 in Chapter 9 can be used to determine the maximum number of conductors permitted in raceways or to determine the minimum size raceway needed for certain conductors.

If all the conductors are the same size and same type of insulation, simply look at Annex C. No calculation is necessary. Annex D is a great resource because it contains examples of calculation methods from the Code. Load-calculation requirements are in article of the National Electrical Code. This month, the topic continues with motor loads as specified in Motor-load calculations are referenced twice in part II of Article Both of these references contain requirements for calculating branch circuits supplying motor loads.

Motor loads shall be calc ulated in accordance with Unless calculating the motor overload protection heaters and overloads , do not use the actual current rating marked on the nameplate. When calculating motor loads, use the values given in Tables The values given in those tables shall be used to determine the ampacity of conductors or ampere ratings of switches, branch-circuit short-circuit and ground-fault protection, instead of the actual current rating marked on the motor nameplate [

 
 

Feeder calculation 3 phase free download. Feeder calculation 3 phase free download. Industrial Calculations: Feeder Loads

 

We’ve looked at lighting loads, receptacle loads, appliance loads, motor loads, compressor loads, and heating or AC loads. Now we’ll show you how to use a one-line diagram to calculate feeder loads. Felipe Ruiz. Edgar Cortes. Alex Papathanasiou. Saurabh Goel. Bruno Samos. Study of air flow directions above Slovenia by lidar detection of aerosols.

Jurica Jukic. To design an installation where continuity of supply is required. To optimise the installation cost. To generate cables schedule and choose proper cable size, for greater system reliability. You are a electrical contractor, Electrical calculation tools can help you: To quickly verify and identify cable losses during trouble shooting purpose. To determine the cross section area of the cable during installation.

When dealing with an extension of an existing installation, or with a load upgrade: To set the new protection and to see the result on the time current curve. To set the new protection taking into account protection discrimination and optimise the cost of the extension.

Largest motor load at 1. Step 2: Select the correct size transformer based , Detail 3, and Table I5 kVA 3 4 13,V 3 1. Based on the following loads, what Electrical Engineering. Related topics. July 3, at pm. July 24, at am. Ezatullah wahdat says:. July 28, at am. Thank you Engineer jignesh farmar i am your new user when i see your lectures. July 30, at pm. Bhupendra Thakkar says:.

August 8, at pm. Sunil Kumar says:. August 18, at am. ARUN says:. August 25, at pm. Nikhil Suthar says:. August 27, at am. Dear Sir, Thank you very much for providing such useful personnel and professional information. Thanks, Nikhil Suthar Email : n. August 28, at am. September 1, at am. Dear Sir, Please accept my heartiest thanks for your extra ordinary effort put on this blog.

September 4, at pm. Sulaiman abubakar says:. September 6, at pm. September 10, at pm. I really liked it and it is useful for persons like me. September 14, at pm. Praveen Yadav says:. September 20, at am.

P says:. October 6, at pm. Sandeep says:. October 7, at am. October 12, at am. S says:. October 17, at pm. Thankyou very much in providing a ready reckoner in the design process. CCM says:. October 18, at pm. October 19, at am.

R says:. October 27, at am. October 27, at pm. Balaji R says:. October 28, at am. Hitesh Dave says:. November 5, at am. November 5, at pm. November 19, at pm. Srinivasan says:. November 26, at pm. Bhavesh Machhi says:. December 10, at pm. December 12, at am. Dear jignesh sir your blogs are very useful to us.

December 13, at am. Dev Tiwari says:. January 1, at pm. January 2, at pm. Issac says:. January 10, at am. January 11, at pm. January 15, at pm. January 16, at pm. Hi, Dear Jignesh. I liked it. Thank you very much. Sudarshan says:. January 21, at am. January 24, at pm. Sreekanth says:. February 9, at am. February 10, at am. Dear Sir, How to calculate ground fault current of the equipment,transformer and generator in order to sizing the earth cable for them?

February 23, at am. Dear Jignesh, You have done a great job and which is very useful for day to day Electrical transactions. Thank you so much and wish u all the very Best. D Venkatapathi Raju. Narendra says:. February 28, at am. Mukul Tyagi says:. March 6, at pm. March 24, at am. Rajini says:. April 5, at am. Hi Sir, Your calculation sheets are very much useful,but i guess it would me more useful for freshers,if u give a demo video on how to use etc.

Regards, Rajini. Gajendiran M says:. April 6, at am. April 16, at pm. April 19, at am. Apoorv Singhal says:. April 23, at pm. April 29, at am. I am ramesh from your previous organisation. Your blog is readly good. Dorababu says:. May 10, at am. Sir Please update calculate the run capacitor and starting capacitor formulas of motor. May 19, at pm. Hi My q is it possible to use ordinary electric tools in hazard classified area. June 14, at am. Ravikumar says:. June 23, at am.

July 2, at am. Manikandan says:. July 5, at am. Ashok Bhat says:. July 16, at am. Pl reply Ashok. August 5, at pm. August 7, at am. August 10, at pm. August 12, at pm. Deva says:. August 16, at pm. Oswaldo says:. August 18, at pm. August 20, at am. August 20, at pm.

August 30, at pm. September 7, at am. Syed Arif Mahdi. September 9, at pm. Vijai says:. October 1, at pm. Parmar G, Its very useful electrical engineers Thanks vijai. October 2, at am. Ashish says:. October 9, at am. Jignesh i think iam late in seeing your blog, it is full informative superb. Prasanthi says:. Dear sir , your site have very useful information, thank you. ASHOK says:. October 29, at am. October 29, at pm. Jose I. Torres says:. October 30, at am. October 30, at pm.

September 14, at am. November 25, at am. December 15, at pm. December 20, at pm. Biramananthan says:. Branch-circuit selection current, per So per your interpretation, the MCA marked on the nameplate is not the branch-circuit selection current.

Location Los Angeles, Ca. I agree with David. Annex D is a great resource because it contains examples of calculation methods from the Code. Load-calculation requirements are in article of the National Electrical Code. This month, the topic continues with motor loads as specified in Motor-load calculations are referenced twice in part II of Article Both of these references contain requirements for calculating branch circuits supplying motor loads. Motor loads shall be calc ulated in accordance with Unless calculating the motor overload protection heaters and overloads , do not use the actual current rating marked on the nameplate.

When calculating motor loads, use the values given in Tables The values given in those tables shall be used to determine the ampacity of conductors or ampere ratings of switches, branch-circuit short-circuit and ground-fault protection, instead of the actual current rating marked on the motor nameplate [ This provision does not apply to motors built for low speeds less than 1, rpm or high torques for multispeed motors. Separate motor overload protection shall be based on the motor nameplate current rating [ Motor-overload protection requirements are in Part III Conductors supplying several motors, or a motor s and other load s , shall have an ampacity not less than percent of the full-load current rating of the highest rated motor plus the sum of the full-load current ratings of all the other motors in the group, as determined by When performing load calculations for feeders and services, if there is more than one motor, start by finding the full-load current of each motor.

Next, multiply the highest full-load current by percent.

 

Feeder calculation 3 phase free download

 
Schneider Electric Global. Browse our products and documents for Electrical calculation tools – Electrical supply online calculation tools. These spreadsheets alow you to shorten the time used for calculations of cables, voltage drop, various selctions of circuit breakers, capacitors. This paper presents a set of modified parameter estimation models for unbalanced three-phase distribution feeders [Show full abstract] that.

 
 

replace.me | Electrical Notes & Articles

 
 

Thread starter KHall Start date Mar 26, Status Not open for further replies. Prev 1 2 3 4 Next. First Prev 3 of 4 Go to page. Location California. Like I said before this is for sizing the branch circuit an individual load. Sizing feeders is not covered in so you have to go back to rules for sizing feeders.

Lets say we have nine of the mentioned unit 1 connected to a volt 3 phase source and was balanced across phases? A “best” balancing method must take power factors into consideration, especially when you have varying types and quantities of 2-pole loads on 3? Location Ohio. I believe the MCA includes the power factor.

In my opinion this MCA divide by v 1? This 1? Location Alabama. Does the VA total for each piece of V,1ph equipment get divided in half between the two phases of the panel that it is connected to? Originally Posted by tryinghard Yes. Using volt-amperes is the prescribed NEC unit for calculating service and feeder loads I don’t see how additions versus new construction make a difference. It’s all in the hands of the system designer. I would have assumed predominance only for additions when the service is upgraded from 1?

I don’t think Iwire’s question was answered. No calculation is necessary. Annex D is a great resource because it contains examples of calculation methods from the Code. Load-calculation requirements are in article of the National Electrical Code. This month, the topic continues with motor loads as specified in Motor-load calculations are referenced twice in part II of Article Both of these references contain requirements for calculating branch circuits supplying motor loads.

Motor loads shall be calc ulated in accordance with Unless calculating the motor overload protection heaters and overloads , do not use the actual current rating marked on the nameplate.

When calculating motor loads, use the values given in Tables The values given in those tables shall be used to determine the ampacity of conductors or ampere ratings of switches, branch-circuit short-circuit and ground-fault protection, instead of the actual current rating marked on the motor nameplate [ This provision does not apply to motors built for low speeds less than 1, rpm or high torques for multispeed motors. Separate motor overload protection shall be based on the motor nameplate current rating [ Motor-overload protection requirements are in Part III Conductors supplying several motors, or a motor s and other load s , shall have an ampacity not less than percent of the full-load current rating of the highest rated motor plus the sum of the full-load current ratings of all the other motors in the group, as determined by When performing load calculations for feeders and services, if there is more than one motor, start by finding the full-load current of each motor.

Next, multiply the highest full-load current by percent. Finally, add the full-load currents of the other motor s into the calculation. For example, what is the minimum rating in amperes for conductors supplying a 5 hp, volt, 3-phase motor; a 10 hp, volt, 3-phase motor; a 15 hp, volt, 3-phase motor; and a 10 hp, volt, single-phase motor? Full-load currents for 3-phase motors are in Table The full-load current for a 5 hp, volt, 3-phase motor is Although the 15 hp motor has the largest amount of horsepower, the motor with the highest full-load current rating is the single-phase motor.

Now add to this value to the full-load currents of the other motors The minimum rating in amperes for conductors supplying these motors is amperes see Figure 3. Such problems could II. The quickly. A fast fault location is also very important in tested feeder is divided into 3 lateral branches and connected distribution systems because the faults in the distribution to load with non homogeneous type of cable.

The one line diagram of the tested network is shown in Fig. For generating results from simulation, three phase fault with zero fault impedance is firstly created on nodes and lines.

From that, the value of harmonic components of inflow current and voltage through the circuit breaker during fault occurrences will be captured. Flowchart of proposed algorithm B. Database Ranking Voltage sag magnitude and phase angle are assumed as a Fig. This assumption can be done for a short distance cables. To rank III. Database Matching the measured sending and receiving voltage sags and the The three phase fault algorithm is established by the listed possible sections obtainable in database matching process illustrated in a sequence of flowchart as shown in Fig.

Formulation of dk is fundamentally formulated from 2. The fault algorithm is based on database approach and trigonometric equation as follow; impedance based method.

The graph voltage sag versus voltage sag magnitudes of Database approach is mainly aim on providing the the network is illustrates in Fig. The shortest distance, dk potential faulted section due to an exact fault occurred at for all possible faulted sections will be compared using this vague location on distribution network. This approach is process. The least distance between the measured voltage sag obtainable from comparison of measured voltage at main and the selected section is selected as the highest possible substation along with an acquisition of voltage sag database fault section.

The second minimum will be the second as stated in the following condition; possible section and the process is repeated for another possible fault sections. The following Fig.

The method starts from the measurement of V2 and I2, followed by obtaining the voltage drop via the branch admittance on Fig. If fault occurred at other nodes after bus y Due To Fault Occurrences F under any circumstances, the process will restart and rise up continuously to an actual node determination before faulty C. Distance Estimation node. The equation can be found in equation 11 and As for the fault distance, impedance based method proposed by Adly A.

Girgis [7] is used. This method utilized single measurement of voltage and current, which is formerly known as one-ended terminal at node prior to fault as displayed in Fig. The distance is developed from single line to ground fault type. For instance, section overlapped with sections , , , 15 along mainline 1. Table I indicates the simulation results on six Icomp is Compensating current A differences tested nodes, whereby each node generates either Ispf, Ibpf is Pre-fault current at phase a, b and c A one or multiple possible faulted sections depending on the Ia, Ib is Fault current at phase a, b and c A voltage sag profile.

Then, the ranking estimation formula is Va is Fault voltage at phase a V applied with priority being given to the lowest value of dk as Vb is Fault voltage at phase b V the first rank. This enables reducing IV. Voltage Sag Profile the faulted feeder or sectionalized switching. Multiple possibilities of faulted section are generated at tested nodes of An identification of possible faulted section can be , , , and based on voltage sag pattern at Fig.

It is constructed based on fault occurrences In order to determine the performance and accuracy of the created on all nodes and lines. Different pattern of voltage sag for main feeder 1, branch 1, branch 2 and branch 3 are illustrated from The fault distance and its percentage of error are display in the graph plotted in Figure 4.

Leave a Reply